A typical Siegerland half-timbered house: built around 1920, partially rendered facade with visible timber framing on the gable end, rubble stone base, gable roof with slate covering. Living area approx. 140 m², inhabited by a family of four.

Condition Before Renovation

  • Energy certificateConsumption index 285 kWh/(m²·a)
  • HeatingOil low-temperature boiler, built 1998, 25 kW
  • Heating oil consumptionapprox. 3,500 liters/year (≈ €4,200)
  • WindowsSingle glazing ground floor, double glazing (1992) upper floor
  • RoofUninsulated, exposed rafters in attic
  • FacadeTimber frame without insulation, infill panels with clay (approx. 15 cm)
  • BasementUninsulated, rubble stone walls, damp at base level

The Special Challenges

🏛️

Preserve Visible Timber Frame

The gable end with visible timber framing is under ensemble protection. External insulation is not possible here — interior insulation is the only option.

💧

Moisture at Base Level

The rubble stone base had no horizontal barrier. Rising damp had to be eliminated before insulation.

🔨

Irregular Wall Thicknesses

Timber frame walls are not flat. Interior insulation had to be adapted to every irregularity — standard boards aren't sufficient.

🌬️

Ventilation Concept in Old Building

After window replacement and sealing, controlled ventilation is required — but routing ducts through timber framing is challenging.

The Measures Implemented

  1. 1

    Roof insulation (between + under rafter)

    14.500 €

    22 cm wood fiber insulation between rafters + 6 cm under-rafter insulation. New vapor retarder (humidity-variable). Slate covering preserved.

  2. 2

    Interior insulation timber-frame gable

    12.800 €

    6 cm calcium silicate boards, fully bonded with lime plaster. Hygrothermal simulation performed beforehand. No vapor barrier needed (capillary-active).

  3. 3

    External insulation street side (ETICS)

    18.200 €

    14 cm wood fiber ETICS on the rendered street side (no visible timber). Silicate render as finish coat.

  4. 4

    Window replacement

    16.400 €

    12 new wooden windows with triple glazing (Uw 0.9). Ground floor heritage windows with glazing bars. Window reveals insulated inside.

  5. 5

    Basement ceiling insulation

    5.800 €

    10 cm mineral fiber applied from below. Horizontal barrier retrofitted at base level (injection method).

  6. 6

    Heating replacement: air-water heat pump

    26.500 €

    11 kW monoblock heat pump (propane R290), installed at house side. Buffer tank 500L, hot water tank 300L. Existing radiators kept (generously sized).

  7. 7

    Decentralized ventilation with heat recovery

    5.200 €

    6 decentralized ventilation units (operated in pairs) with 87% heat recovery. Core holes on rear side.

Costs and Subsidies

  • Total measure costs99.400 €
  • BEG grant building envelope (20%)−13.540 €
  • BEG grant heating (35%)−9.275 €
  • BEG grant ventilation (20%)−1.040 €
  • Total subsidies−23.855 €
  • Own contribution75.545 €
  • KfW supplementary loan (low-interest)75.545 €

The Result

Before

285

kWh/(m²·a)
After

62

kWh/(m²·a)
  • Energy savings78 %
  • New heating costs/year~950 €
  • Savings/year~3.250 €
  • CO₂ reduction~8,5 t → ~1,2 t

💡 The family saves around €3,250 in heating costs annually. With an own contribution of €75,545 and the low-interest KfW loan, the renovation pays for itself in about 18 years — significantly faster with rising energy prices.

What We Learned

Timber Framing Needs Experience

Not every tradesperson can work with timber framing. Choosing the right specialist companies was crucial — especially for interior insulation.

Hygrothermal Simulation Prevents Errors

The building physics calculation before interior insulation showed that 6 cm calcium silicate is the optimal thickness. Without simulation, it would have been easy to over- or under-insulate.

Heat Pump Works Here Too

Despite old building with radiators: after building envelope renovation, the flow temperature dropped to 45°C — ideal for the heat pump. COP in the first winter: 3.6.

The iSFP Paid Off

The individual renovation roadmap determined the right sequence and secured 5% extra funding on every building envelope measure.

Renovate Your Half-Timbered House?

Every half-timbered house is different. We create an individual renovation roadmap that optimally combines building physics, heritage protection, and funding options.

Request consultation